CITY HALL ONLINE / City Departments / Recreation & Parks > Big Creek Greenway Trail

Greenway Status Update

The Big Creek Greenway Trail in Alpharetta is currently CLOSED.

The Big Creek Greenway Trail System

"We have not inherited the earth from our parents,we are borrowing it from our children."- Native American saying

The concrete trail is about 6.15 miles (10 kilometers) in length. The greenway runs along Big Creek parallel to North Point Parkway, from Webb Bridge Road on thenorth end to Mansell Road on the south end. A soft mulch trail encircles a large wetland between Haynes Bridge Road and Mansell Road. Wildlife such as blue heron, deer, ducks and Canada geese can be observed in this preserved water setting.


(For larger PDF version click on image)

WHAT IS A GREENWAY?
A greenway is a linear park. A greenway is about people and the land they love. It is about conservation. It is about recreation and alternative transportation. It is about environmental education. It is about connecting the quality of life Alpharetta now has with the future plan that will help maintain that quality of life. Our greenway is an investment in the future of Alpharetta...an Alpharetta that is green, with open spaces for people as well as natural areas for plants and animals.

The Big Creek Greenway is primarily a 12-foot wide concrete path that meanders through the deciduous woods along Big Creek. The greenway offers an ideal setting for walking, jogging, inline roller blading, and biking. Dirt mountain bike trails are located on the east side of the creek 2/5 mile south of Webb Bridge Road.

HOW LONG IS THE BIG CREEK GREENWAY?
Total length of the Big Creek Greenway, from Webb Bridge Road to Mansell Road, is approximately 6.2 miles (10 kilometers)

WHERE CAN THE GREENWAY BE ACCESSED?
Alpharetta YMCA: From Old Milton Parkway, go 1/4 mile north on North Point Parkway to Preston Ridge Road and turn right toward the YMCA.

Haynes Bridge Road: From North Point Parkway, go 1/5 mile south on Haynes Bridge Road. A parking lot is on the east/left side of Haynes Bridge Road across from the Archstone Apartments.

North Point Mall: Driving northbound on North Point Parkway halfway between Mansell and Haynes Bridge Roads, find the greenway sign directly across from Haverty's Furniture.Parking is located in a wooded area. Restrooms are available at that location. 800 feet south of this entrance is the NorthPoint Village retail center. Walk behind the shops to the stairway that leads to the wetlands mulch trail. Note: The stairs are not A.D.A. accessible.

Kimball Bridge Road: Located 1/4 mile southeast of North Point Parkway, across from New Prospect Elementary School.Parking is allowed at the school during hours when school is not in session (weekends, after hours on school days,and during the summer.)

IS THE BIG CREEK GREENWAY COMPLETE?
No.  Plans are to extend the greenway north of Webb Bridge Road to Windward Parkway on the west side of the creek.  Long range plans include connection to the Forsyth County trail system.

WHAT CAN I DO TO HELP?

  • Most importantly, "Use but don't abuse". Please stay on the trail and stay off the berm that separates the concrete path from the creek.
  • Keep the greenway litter free. Hold your expendables until the first available litter can.
  • Respect other users and types of uses. Bikers: Please watch for darting children!
  • Be a "steward" of the Big Creek Greenway. Call (678) 297-6123 to report any damage such as fallen trees.
  • Financially support greenway maintenance. Maintaining the linear park costs more than its construction. In addition, we would like to add more amenities, such as a formal flower garden and a children's play area. You may send a check (not cash) made payable to City of Alpharetta Recreation and Parks.
    Mail to:
    Alpharetta Recreation & Parks Department
    1825 Old Milton Parkway
    Alpharetta, GA 30009